| Fire Protection | |||||||||||||||||||||||||||||
| The Penn Tower Hotel on the Campus of University of Pennsylvania Philadelphia, PA |
|||||||||||||||||||||||||||||
| A new computerized fire alarm, smoke detection, air handling unit shutdown and control, audio evacuation, firemen's communication system, elevator recall, fire pump supervisory monitoring, dry pipe sprinkler system monitoring, and floor-by-floor sprinkler retrofit with tamper flow monitoring for this 21-story tower was designed by PSE. |
|||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||
| Wyndham Hotel at Franklin Plaza Philadelphia, PA |
|||||||||||||||||||||||||||||
| PSE designed a new life safety/fire alarm system replacing the 20-year-old system. PSE provided the one million sq. ft. hotel with digital true-alarm, multiplex fire alarm/smoke detection using dual color graphic computers for fire command and maintenance. New high pressure stand-pipe flow control was also provided. | |||||||||||||||||||||||||||||
| Rutgers, The State University of New Jersey, Multiple Building Campus-Wide | |||||||||||||||||||||||||||||
| PSE provided complete high-rise and low-rise sprinkler retrofits in over one-half million sq. ft. of student housing. | |||||||||||||||||||||||||||||
| CIGNA Headquarters Two Liberty Place Philadelphia, PA |
|||||||||||||||||||||||||||||
| For this 60-story office tower, PSE designed a new fire alarm system with audio evacuation, exhaust and pressurization complete with computer monitoring. PSE performed evacuation and certification testing for life safety systems. |
|||||||||||||||||||||||||||||
![]() |
Richard Stockton College Pomona, NJ |
||||||||||||||||||||||||||||
| PSE met the project objective of installing a code-compliant fire suppression system on a tight schedule for student residential facilities and academic buildings. All systems are concealed to reflect the aesthetic nature of the properties. | |||||||||||||||||||||||||||||
| James River Correctional Center State Farm, VA |
![]() |
||||||||||||||||||||||||||||
| PSE continues to provide multidisciplinary project coordination of architecture and engineering including new topographic surveys, underground utility assessment, soil testing and geotech analysis, stair structural requirements, and life safety determination/recommendations meeting strict requirements of the National Fire Code, State Fire Marshall, and BCOM A/E Practice Manual. |
|||||||||||||||||||||||||||||
![]() |
Powhatan Correctional Center State Farm, Virginia |
||||||||||||||||||||||||||||
| PSE provided a complete life safety scope of work for life safety improvements to “M” building, a tiered maximum security wing as well as a basement level detention area. All modifications were accomplished during occupancy with all systems furnished as specified in compliance with ADA requirements, several unusual State Fire Marshall demands, BCOM A/E services manual directives, and institutional needs. |
|||||||||||||||||||||||||||||